Unreviewed extracted text
Quote request V2
This is an automatic text extraction, NOT a verified accessible equivalent. Images, table relationships, layout and reading order may be missing or incorrect. Check the original or request an accessible version.
Source page 1
NORTH PETHERTON TOWN COUNCIL
Heathfield Cemetery, Old Road, North Petherton
Gardens of Rest, Replacement of low hedging
QUOTATION REQUEST
Miss Joy Norris - Town Clerk
North Petherton Town Council
The Small Hall
North Petherton
Somerset
TA6 6QA
01278 574074
joy.norris@northpethertontowncouncil.gov.uk
25 September 2024
Page 1 of 6
Source page 2
NORTH PETHERTON TOWN COUNCIL
INSTRUCTIONS FOR SUBMITTING QUOTATIONS
1.
Contractors will be held to have fully informed and satisfied themselves by their own
independent observations and enquiries, including where appropriate, site visits and
inspection of drawings, as to the nature, extent and practicability of the works and
where appropriate the positions relevant thereto of buildings, structures, the means
of access to the works and all other points which can in any way affect the prices
inserted in the Form of Quotation.
2.
Where drawings are issued with documents, quotations should use them as a
starting point but contractors should check all measurements.
3.
Where a quotation requires entry by the contractor they must be completed in ink or
typescript and signed by the contractor.
4.
All contract documents, including drawings, whether a quotation is submitted or not,
remain the property of North Petherton Town Council and shall be treated as private
and confidential.
5.
Quotations shall remain open for acceptance for a period of 90 days after the latest
date for submission.
6.
The Council will not be responsible for, or pay any expenses or losses, which the
contractor may incur in the preparation of their quotation.
7.
Quotations are to be returned to: Miss Joy Norris, Town Clerk, North Petherton
Town Council, The Small Hall, Fore Street, North Petherton, Somerset TA6 6QA
QUOTATIONS TO BE RECEIVED BY NO LATER THAN NOON ON 25 October 2024
Page 2 of 6
Source page 3
SPECIFICATION
The Cemetery has 2 areas for the interment of cremated remains, known as the Garden of
Rest / Remembrance, these are currently delineated by box hedging approx. 80cms high.
During the past year the box has been affected by box moth with most of the leaves and
green shoots being eaten by the caterpillars.
The Town Council has decided that the box hedging should be replaced by yew or ilex or a
mixture of both.
The drawings included with this document give an indication of the approximate lengths of
hedging (please note they are indicative only and are not to scale) but it is strongly
suggested that before submitting a quotation contractors should verify the relevant lengths
of hedging to ensure they quote for a suitable number of plants. (The cemetery is not
locked and the 2 Garden of Rest areas are easily found just inside the gates).
The Town Council will try to avoid booking any interments in the Garden of Rest whilst the
contractor is scheduled to be on site, however if, for any reason, an interment does need
to be scheduled the contractor will be informed and will cease work for the duration of the
interment (normally 30mins -1hour)
There is water and electricity in the nearby chapel building but any hoses or extension
leads would need to be brought to site by the contractor.
The submitted quotation should include pricing for:
• Digging-out, removal and disposal of the existing box hedges
• Preparing the ground for planting new hedging
• Supply (and delivery) of the new plants
• Planting of the new plants
• Return to site every 3 months for a 1 year period from the planting date to check on
health of plants and replace any that are failing to thrive
• Providing care instructions for the new plants
It would be helpful if contractors also indicated separately to the quotation document if they
would be prepared to attend site and water the new plants as and when required and gave
a price for doing so.
Page 3 of 6
Source page 4
HEALTH & SAFETY – INCLUDING METHOD STATEMENT
The working area and any storage area must be fenced / cordoned off to protect members
of the public whilst work is in progress.
Whilst there should be no previous interments in the hedged area care must be taken not
to disturb any graves and the site must be treated with respect at all times.
The contractor is to provide with the quotation, a simple method statement to show the
method of working and in particular how safety of the public and workers will be ensured
during the course of the works.
INSURANCE
The contractor shall maintain a comprehensive policy of public liability and employer’s
liability insurance. In respect of its liability such insurance cover to be maintained and
provide for a minimum of £5,000,000 (FIVE MILLION POUNDS). Cover in respect of
death of personal injury due to negligence will be unlimited.
A copy of the contractors insurance should be provided with their quotation submission.
PAYMENTS
Payment to the contractor will be within 28 days of receipt of invoice subject to agreement
of the account by the Town Clerk.
REFERENCES
The form of quotation requests contractors to provide the names of 2 people /
organisations for whom they have undertaken similar work.
Page 4 of 6
Source page 5
FORM OF QUOTATION
The closing date for receipt of completed quotation form is 12 Noon on 25 October 2024
To:
Miss Joy Norris – Town Clerk
North Petherton Town Council
The Small Hall
Fore Street
North Petherton
Somerset
TA6 6QA
Contractor’s Name: …………………………………………………………………
(in block letters)
SHORT DESCRIPTION OF WORKS:Heathfield Cemetery, Old Road, North Petherton: Gardens of Rest, replacement of low
hedging
Reference Contact 1:
Contact Name: ………………………
Company Name: …………………………….
Address: ………………………………………………………………………………………
Phone No: ………………………
e-mail address: ………………………………………
Reference Contact 2:
Contact Name: ………………………
Company Name: …………………………….
Address: ………………………………………………………………………………………
Phone No: ………………………
e-mail address: ………………………………………
Having examined the specification for the above-mentioned works, we offer to carry out the
whole of the said works in conformity with the said specification (detailed on Page 3 of this
quotation request form) for the sum stated below
Total quotation prIce £
(price to be excluding VAT)
Page 5 of 6
Source page 6
In accordance with the planting scheme that you have provided please state:
New plant type
Number of plants
Plant size to be supplied
We can advise that once the Quotation is formally accepted we can anticipate being able
to commence the work within ………………………………….. weeks and to
complete the works within ……………… weeks. (If there is a preferred planting time to
maximise the chances for the hedges to take please provide this information and give
details of when you would undertake the work below)
This quotation together with your written acceptance thereof, shall constitute a binding
contract between us.
Checklist of information / documents to accompany completed quotation form:
Public Liability Insurance
Employers Liability Insurance
Full description of how contractor will undertake works / methods to be used and
work schedule
Plan / drawing showing suggested planting scheme
(following acceptance of a quotation the contractor will provide the method statement
/ relevant health and safety information and risk assessment)
We understand that you are not bound to accept the lowest or any other quotation you
may receive and that this quotation will remain open for acceptance for a period 90 days
from the latest date for receipt of quotations.
Yours faithfully
Signature:
………………………………..
Date: …………………………………...
Name :
…………………………
Address:
…………………………………………………………………………………….
Company:
……………………………………
…………………………………………………………………………………….
Tel No:
………………………
e-mail: ……………………………………………
Page 6 of 6