Unreviewed extracted text
A38 Cumulative Traffic Report Vr 1.5B Aug 2026
This is an automatic text extraction, NOT a verified accessible equivalent. Images, table relationships, layout and reading order may be missing or incorrect. Check the original or request an accessible version.
Source page 1
Combined Traffic Impact of Current and Proposed Housing
Developments Within the North Petherton / Huntworth
Corridor
This is a live technical evidence document and will be updated as new Transport Assessments,
modelling data, traffic counts or planning information become available
© Version 1.5B August 26
Source page 2
Abstract
This report presents a comprehensive technical assessment of cumulative traffic impacts associated
with existing and proposed residential developments along the A38 North Petherton – Huntworth
corridor. The study considers both individual and combined effects on network performance, highway
safety, and policy compliance, in accordance with the National Planning Policy Framework (NPPF), the
Sedgemoor Local Plan (SLP), and Somerset Local Transport Plan 4 (LTP4).
The assessment reflects a total development quantum of 2,730 dwellings. Findings indicate material
capacity constraints, increased congestion potential, and elevated safety and air-quality sensitivities
along key sections of the corridor. These outcomes highlight the importance of coordinated transport
planning and strategic infrastructure intervention to ensure long-term policy compliance and
sustainable network operation.
1
Source page 3
Executive Summary
This cumulative traffic assessment confirms that the current and planned residential development
proposals — totaling 2,730 dwellings — would generate a severe, non-mitigatable impact on the A38
corridor, the principal link between North Petherton and M5 Junction 24.
Current Applications (1,330 Dwellings)
Forecast modelling indicates a 48.28% increase in daily traffic volumes relative to the updated DfT
2021 baseline data (16,530 vehicles). This contravenes Sedgemoor Local Plan Policy D13, which
requires development to minimise adverse traffic impacts. Within one to five years of occupation,
the corridor is projected to experience routine peak-hour congestion and network stress.
Cumulative Scenario (2,730 Dwellings)
When combined with future allocations, daily traffic flows are expected to increase by approximately
99.09% relative to the updated DfT 2021 baseline data (16,530 vehicles). This engages NPPF TR6(3)(4): cumulative impacts must be assessed, and proposals refused where severe adverse
capacity/congestion impacts remain after taking account of mitigation and wider network
improvements.
Safety and Health Implications
The projected increase in vehicle movements conflicts with Somerset LTP4’s Vision Zero
commitment, exacerbating existing high-risk conditions along the A38 and worsening local air quality.
Persistent queuing and slow-moving traffic are expected to elevate exposure to NOₓ and PM₂.₅,
posing long-term public-health risks.
Policy and Mitigation Context
Taken together, these findings indicate that the cumulative development scale cannot be
accommodated within the existing highway network without strategic intervention. While localised
junction optimisation may marginally improve efficiency, meaningful mitigation would require
corridor-wide infrastructure upgrades. Continued monitoring and phased delivery aligned to
demonstrable transport improvements are recommended to ensure future policy compliance.
2
Source page 4
Contents
Abstract ................................................................................................................................................... 1
Executive Summary ................................................................................................................................. 2
Part 1 – Impact from Current Applications (Updated 1,330 Dwellings) .................................................. 4
Part 2 – Cumulative Scenario (Updated 2,730 Dwellings) ....................................................................... 7
Part 3 – Policy, Safety & Health Analysis ................................................................................................. 8
Part 4 – Key Findings & Recommendations ........................................................................................... 10
Appendix U (Update) — Applicant TRICS Consistency Review .............................................................. 12
Appendix T (Update) — DfT TAG Screening Appraisal........................................................................... 14
Revisions / Updates ............................................................................................................................... 16
3
Source page 5
Part 1 – Impact from Current Applications (Updated 1,330 Dwellings)
Overview
This section analyses eight live planning applications within the North Petherton study area,
representing a combined total of 1,330 residential units. The assessment quantifies traffic generation,
identifies network implications, and evaluates compliance with adopted transport policies.
Application Summary
Application Name
Application No.
Dwellings (Units)
Park Lane
37/25/00044
64
Gateway (Phase 1)
37/25/00055
15
Gateway (Phase 2)
37/25/00042
346
Vistry Gateway
37/22/00126
150
Stafflands Farm
37/25/00023
190
Daws Lane
37/25/00018
175
Dancing Hill
37/25/00088
140
Shovel Lane
TBC
250
Total
—
1,330 units
Traffic Generation and Baseline Data
Calculation Parameter
Detail
Adjusted Baseline Traffic Adjusted DfT 2021 A38 corridor baseline *
New Daily Trips
1,330 units × 6.0 trips/unit/day
Result
16,530 vehicles
7,980 trips/day
48.28 %
% Increase on Baseline
7,980 ÷ 16,530 × 100
increase
*Adjusted working baseline: DfT 2021 A38 link (A361 junction to A38 spur/M5 J24), uplifted for 235
dwellings in post-2021 major committed developments not represented in the 2021 count.
4
Source page 6
Trip Rate Justification and Sensitivity Context:
The main assessment adopts a trip-generation rate of 6.0 two-way trips per dwelling per 12-hour
day, consistent with TRICS residential averages for small towns and semi-rural locations with
moderate accessibility. This reflects typical car-ownership levels and commuting patterns within
North Petherton.
To confirm robustness, a sensitivity test was applied using 7.2 trips per dwelling (equivalent to 0.6
two-way trips per hour), representing a higher-intensity scenario sometimes applied in national or
urban contexts. The outcome indicates that while numerical uplifts increase proportionally, the
overall policy interpretation and impact classification remain unchanged.
Sensitivity Note: Applying 7.2 trips/unit/day yields 9,576 trips/day and a 57.93% increase on the
same baseline; this does not materially alter the interpretation of network stress or policy context.
Individual Application Traffic Contributions (12-hr day; 6 trips/dwelling; baseline 16,530)
Application
Units New Trips/day
% Total New Trips
% Increase on Baseline
Park Lane
64
384
4.81%
2.32%
Gateway Phase 1
15
90
1.13%
0.54%
Gateway Phase 2
346
2,076
26.02%
12.56%
Stafflands Farm
190
1,140
14.29%
6.90%
Daws Lane
175
1,050
13.16%
6.35%
Shovel Lane
250
1,500
18.80%
9.07%
Vistry Gateway
150
900
11.28%
5.44%
Dancing Hill
140
840
10.53%
5.08%
TOTAL
1,330
7,980
100%
+48.28% overall
5
Source page 7
Policy and Guidance Position (1,330 Dwellings)
Although this scenario alone is not assessed here as meeting the NPPF TR6(4) “severe adverse
impact” refusal test, it demonstrates inconsistency with local transport-policy objectives and
materially worsens network stress.
Policy / Guidance
Reference
Relevance
Policy D13 – Sustainable A ~48 % traffic increase fails to minimise adverse
Sedgemoor Local
Transport and
impacts, increasing congestion, air-quality pressures
Movement
and safety risk.
Sedgemoor Local
Policy D14 – Managing
Anticipated congestion at M5 J24 compromises safe
Plan (SLP)
Transport Impacts
and efficient SRN operation.
Plan (SLP)
Conflicts with Vision Zero and sustainable-travel
Somerset LTP4
Vision and Objectives
principles.
Time-Based Network Performance Projections (1,330 Dwellings)
Timeframe Projected Impact on A38 / SRN Network
Key Policy Conflict
Frequent network stress; recurrent peak-period
SLP Policy D14 – Network efficiency
congestion; M5 J24 approaching capacity.
undermined.
10–15
Persistent capacity deficit; traffic diversion to
SLP Policy D13 – Failure to minimise
Years
unsuitable roads; elevated collision risk.
adverse impacts.
1–5 Years
Long-term congestion and progressive air-quality NPPF TR3/TR6 – sustainable
20 + Years
deterioration.
6
transport/network impacts.
Source page 8
Part 2 – Cumulative Scenario (Updated 2,730 Dwellings)
Overview
This cumulative scenario combines the eight current planning applications (1,330 dwellings) with the
proposed project of approximately 1,400 dwellings at Walford Cross, producing a total of 2,730
residential units.
The assessment models overall trip generation, cumulative network stress, and long-term policy
compliance.
Traffic Generation and Baseline Comparison
Calculation Parameter
Formula / Data Used
Result
Baseline Traffic
Adjusted DfT 2021 A38 corridor baseline *
16 530 vehicles
2,730 × 6.0 trips/unit/day
16,380 trips/day
(16,380 ÷ 16,530) × 100
99.09 % increase
Total New Daily Trips
% Increase on Baseline
*Adjusted working baseline: DfT 2021 A38 link (A361 junction to A38 spur/M5 J24), uplifted for 235
dwellings in post-2021 major committed developments not represented in the 2021 count.
Sensitivity Note: Using a 7.2-trip rate produces 19,656 trips/day (+118.91%), confirming the same
severe-adverse-impact conclusion under NPPF TR6(4), subject to mitigation and wider network
improvements. The use of 6.0 trips/dwelling provides a representative mid-range scenario aligned
with TRICS data, while the 7.2-trip test provides a robust upper-bound sensitivity check.
Time-Based Network Performance Projections
Timeframe Projected Impact on A38 / SRN Network
Policy and Compliance Implications
1–5 Years
Systemic capacity failure; chronic gridlock
along A38/A361; M5 J24 breakdown;
restricted emergency access.
NPPF TR6(4) – severe adverse network
impact; SLP D14 – strategic network
compromised.
10–15
Years
Prolonged congestion; degraded air quality
(NOₓ, PM₂.₅); unsafe active-travel conditions.
SLP D13 – Cannot minimise adverse
impacts; Somerset LTP4 – Vision Zero
conflict.
Persistent corridor congestion; economic
20 + Years constraints; requirement for major
infrastructure (bypass or junction upgrade).
7
NPPF TR3/TR6 – sustainable
transport/network capacity.
Source page 9
Interpretation and Severity Assessment
The near-doubling of traffic is assessed as a severe adverse transport-network impact under NPPF
TR6(4), including cumulative impacts.
Expected effects include:
•
Network-wide congestion and delay
•
Operational failure at M5 J24
•
Increased collision risk
•
Worsening air quality and public-health harm
No realistic mitigation package exists that would maintain network performance or policy compliance
at this scale.
Part 3 – Policy, Safety & Health Analysis
Policy and Guidance Compliance Summary
Policy / Guidance
National Planning
Policy Framework
(NPPF)
Reference
Compliance Position
TR6(3)-(4)
Cumulative impacts assessed as a severe adverse
network impact, subject to mitigation and wider
network improvements.
Sedgemoor Local Plan
Traffic growth challenges objectives to minimise
Policies D13 & D14
(SLP)
adverse impacts and maintain safe operation.
National Highways
SRN Sensitivity to
Growth Principles
Forecast traffic uplift exceeds typical strategic-network
growth acceptance bands without major mitigation.
Somerset LTP4
Vision & Objectives
Growth reduces scope for sustainable-travel and safety
improvement programmes.
Detailed Impacts on Health, Travel, and the Strategic Road Network (SRN)
Public Health Implications:
Projected long-term queuing within North Petherton’s residential corridor will increase exposure to
airborne pollutants (NOₓ and PM₂.₅). This condition constitutes a chronic public-health hazard,
directly undermining the social and environmental pillars of sustainability defined by the NPPF.
Impact on Travel and Network Efficiency:
The A38 serves as a critical link in Somerset’s Strategic Road Network, connecting regional traffic to
the M5. Functional failure of this corridor would have cascading effects on both local and national
movement, affecting logistics, commuter traffic, and emergency access. Diversion of vehicles onto
unsuitable local roads is expected to increase accident exposure and reduce residential amenity.
8
Source page 10
Accident Data and Safety Context
High-Risk Corridor:
The A38 already exhibits an above-average accident frequency, with certain sections recording
incident rates exceeding twice the national mean.
Incident
Description
Date
Location
Injuries / Outcome
04 August
2024
A38 Taunton Road, Bridgwater
Serious collision
Fatal – motorcyclist died at
(between Huntworth Business Park
between
scene; road closed for
Rbt and Showground Rd /
motorcycle and car. investigation.
Stockmoor Dr Rbt)
04 October
Walford Cross (junction with A361)
2024
Tractor–car
collision.
Serious injuries; air
ambulance deployed; full
road closure.
13
December
2019
A38 North of Huntworth
Roundabout, Bridgwater
Three-vehicle crash.
Non-fatal; caused
significant delays.
17
November
2019
A38 at Thurloxton (between Walford Motorcycle–car
Cross and Moon Lane)
collision.
Fatal – motorcyclist
sustained fatal injuries;
road closed for
investigation.
Observed A38 Traffic Volume and Speed Data (Pegasus Group / Daws Lane)
Measure
Evidence
Traffic flow
5-day: 11,100; 7-day: 10,300 178 buses/coaches (weekday)
85th %ile speed NB 39.47 mph
Context
SB 39.66 mph
Pegasus's April 2023 A38 ATC recorded a weekday average of 11,100 vehicles/day, including 178
buses/coaches, with 85th-percentile speeds of 39.47 mph northbound and 39.66 mph southbound. This
provides contemporary local validation of traffic intensity and operating speed alongside the adjusted DfT
corridor baseline.
Existing Network Conditions
The A38 / M5 Junction 24 corridor experiences recurrent congestion even under baseline conditions.
National Highways and RAC monitoring regularly report “severe delays” during peak and seasonal
traffic periods. These findings confirm that the network currently operates near or beyond its design
capacity, rendering it highly sensitive to additional growth.
9
Source page 11
Part 4 – Key Findings & Recommendations
Key Findings
The cumulative development quantum (2,730 dwellings) results in an approximate 99.09% increase in
daily traffic on the A38/A361 corridor versus the revised 2021 baseline.
Key observations:
•
Increased congestion on the A38 and M5 J24.
•
Forecast demand beyond operational capacity at multiple junctions.
•
Limited potential for safety and mode-shift programmes.
•
Increased exposure to air-quality sensitivity zones.
Network Performance Outlook
Proportional modelling indicates:
•
Recurring peak-period delays during early occupation.
•
Consolidation of queuing in later phases.
•
Extended journey-time variability for local and strategic movements.
Policy Alignment Position
The forecast demand presents challenges for:
•
NPPF TR6 cumulative transport impact test.
•
SLP D13 & D14 transport policies.
•
SRN growth-sensitivity guidance.
•
Local authority mode-shift and Vision Zero objectives.
Mitigation Context
10
•
Local junction works alone will not offset demand pressures.
•
Strategic-scale intervention (e.g., junction reconfiguration or bypass) likely required.
•
Funding and timing must be defined before counting as deliverable mitigation.
Source page 12
Conclusion and Recommendations
The cumulative scenario indicates traffic demand exceeding the capacity of the A38 corridor and M5
J24.
This provides a technical basis for identifying cumulative operational constraints and the need for
strategic infrastructure planning.
Recommendations:
1. Seek strategic-transport planning input on corridor-wide solutions.
2. Phase development to match demonstrable capacity improvements.
3. Implement ongoing corridor performance monitoring to inform future planning decisions.
11
Source page 13
Appendix U (Update) — Applicant TRICS Consistency Review
U1. Purpose
This appendix reviews applicant-submitted Transport Assessments to test whether the trip
generation assumptions used in the Cumulative Traffic Report (August 2026 Ver 1.5B) are reasonable
when compared against locally submitted TRICS evidence.
The review uses only the following applications:
•
Park Lane (37/25/00044) — Miles White
•
Daws Lane (37/25/00018) — Pegasus
•
Bridgwater Gateway Phase 2 (37/22/00126) — Peter Evans Partnership (using National
Highways benchmark rates)
No independent TRICS analysis has been undertaken.
U2. Applicant Peak-Hour Trip Rates
Site
Dwellings AM Peak two-way (veh/dw/hr) PM Peak two-way (veh/dw/hr)
Park Lane
64
0.503
0.510
Daws Lane
175
0.523
0.489
Gateway Phase 2 150
0.560
0.585
U3. Methodological context
Park Lane (Miles White)
Recent TRICS surveys (2022–2024), small sites (40–100 dwellings), servicing vehicles excluded and
inclusion of some edge-of-centre locations. This produces a lower-bound benchmark.
Daws Lane (Pegasus)
Large TRICS sample (2014–2024), edge-of-town and suburban car-based locations. The applicant
explicitly describes this as a “robust / maximum trip generation” scenario.
Gateway Phase 2 (PEP)
Uses National Highways-required benchmark trip rates derived from earlier strategic TRICS surveys.
These are stated to be higher than more recent TRICS averages and therefore represent a strategic
upper bound.
12
Source page 14
U4. Locally evidenced envelope
Across the three applicant Transport Assessments a consistent envelope emerges:
•
AM Peak: ~0.50 – 0.56 veh/dw/hr
•
PM Peak: ~0.49 – 0.59 veh/dw/hr
This envelope is entirely derived from applicant-submitted evidence.
U5. Sites Not Yet Incorporated into Appendix U
Appendix U reviews only those Transport Assessments currently examined as part of this report,
namely Park Lane, Daws Lane and Bridgwater Gateway Phase 2.
At the time of publication, additional transport evidence may exist for other sites within the
cumulative assessment area; however, these documents have not yet been reviewed as part of this
appendix and are therefore not included within the locally evidenced trip-rate envelope established
in Section U4.
For cumulative assessment purposes, where site-specific trip-generation data has not yet been
reviewed, it is reasonable to apply a proxy trip rate based on the locally evidenced envelope:
• Central proxy: mean of Park Lane, Daws Lane and Gateway Phase 2
• Robust proxy: upper bound (National Highways benchmark)
This approach is consistent with DfT / TAG practice when site-specific data is incomplete or has not
yet been incorporated into the cumulative assessment.
U6. Implication for the Cumulative Traffic Report
The Cumulative Traffic Report uses 6.0 and 7.2 daily trips per dwelling.
When translated into peak-hour equivalents, these fall within or below the locally evidenced TRICS
envelope above.
Accordingly, the cumulative modelling assumptions are reasonable and not optimistic when tested
against applicant Transport Assessments.
13
Source page 15
Appendix T (Update) — DfT TAG Screening Appraisal
T1. Purpose
This appendix applies DfT TAG (WebTAG) screening to the TRICS-validated demand established in
Appendix U.
Two cases are considered:
•
Central case: mean of Park Lane, Daws Lane and Gateway Phase 2
•
Robust case: National Highways upper bound (Gateway Phase 2)
T2. Peak-hour demand used
From Appendix U:
•
Central peak rate: ~0.53 veh/dw/hr
•
Robust peak rate: ~0.58 veh/dw/hr
For 2,730 dwellings:
Case
AM peak two-way flow
Central
~1,447 vehicles/hour
Robust (NH) ~1,583 vehicles/hour
These flows would feed directly into the A38 / Huntworth Roundabout / M5 J24 system.
T3. TAG screening interpretation
Under WebTAG Unit A1.3:
•
Flows of this scale on a corridor already operating near capacity result in:
o
Severe delay
o
Queue propagation and reliability failure
o
Network instability at M5 Junction 24
These impacts trigger TAG “large adverse” user impacts.
T4. Economic, safety and environmental implications
Using DfT standard values of time and accident valuation, flows of this magnitude produce:
•
14
Multi-million-pound annual journey-time losses
Source page 16
•
Increased collision risk on the A38 and SRN approaches
•
Higher NO₂ and PM₂.₅ exposure from persistent queuing
These represent material adverse impacts under TAG Units A1 (user impacts), A3 (environment) and
A4.1 (social/safety).
T5. TAG conclusion
Using applicant-validated TRICS demand (Appendix U), the cumulative development scenario results
in:
Severe residual transport impacts under DfT TAG.
This supports the NPPF TR6(4) conclusion in the main report that the cumulative scheme would have
a severe adverse network impact unless effective strategic mitigation changes that outcome.
15
Source page 17
Revisions / Updates
Version Date Revision Details
1.3
Updated baseline traffic to reflect post-2021 major residential developments (Royal
Nov View, Chaucer's Meadow, Batts Meadow and Carrots Farm). Trip generation values
2025 revised to reflect the location and settlement characteristics of assessed
developments in accordance with TRICS guidance.
1.4
Jan
Added Appendix U (Applicant TRICS Consistency Review) and Appendix T (DfT TAG
2026 Screening Appraisal).
1.5
Updated to include the proposed Shovel Lane residential development (250
dwellings) within the cumulative assessment area. Current application totals revised
from 1,080 to 1,330 dwellings and cumulative development totals revised from
2,480 to 2,730 dwellings. Updated all associated trip-generation calculations,
June
percentage traffic increases, cumulative scenario forecasts, DfT TAG screening
2026
outputs, summary tables and cumulative impact assessments. Revised Appendix U
to clarify the status and review coverage of available Transport Assessments and
supporting transport evidence. Updated Executive Summary, Key Findings and
associated figures to maintain consistency throughout the report.
1.5A
Data clarification only. Retained the adjusted 16,530-vehicle DfT corridor baseline and
Aug all existing cumulative calculations. Clarified baseline provenance and replaced the
2026 derived speed-band summary with direct Pegasus 2023 ATC evidence for local traffic
volumes, bus/coach flows and 85th-percentile speeds.
1.5B
Aug NPPF reference update only: superseded §116 references replaced by August 2026
2026 NPPF TR3/TR6. No traffic data, modelling or calculations changed.
Disclaimer (Errors & Omissions)
This assessment is based on information available at the time of preparation. It is provided for
technical and planning purposes only and does not constitute a legal document or precedent. While
every effort has been made to ensure accuracy, no liability is accepted for any errors, omissions, or
reliance placed on the contents beyond its intended scope.
August 2026 Ver 1.5B
16